Context and Need
A Mobile Virtual Network Operator switched to a different Host MNO, resulting in challenges concerning service continuity and the termination of the existing contract.
Actions Undertaken
Esparvel conducted a careful preliminary study before planning, assessing the contractual constraints and regulatory risks associated with the project. Following this study, Esparvel participated in migration planning and provided advice during execution to the teams responsible for the migration.
Achievements and Benefits
The migration was completed efficiently within the minimum timeframe, ensuring uninterrupted service and compliance with all contractual obligations.